October 22, 2017 Wire spun brushed all L/H Fuselage gusset plates front and back.
Total time 1 Hour
October 22, 2017 - Evening Work... Finished
aft end of L/H side of fuselage. Cut and coped L/H and R/H diagonal rib F20.
Total time 1.5 Hours
October
2, 2017 (2.5 Hours) Finished all vertical ribs for left and right hand sides of
fuselages F12, 15, 17,
October
1, 2017 (5 Hours) Bent/formed lower left and right fuselage longerons. Fitted and coped
vertical members F6, F7, F9 for the fuselage left hand side. Made duplicates
for right hand side of fuselage.