Saturday, April 28, 2018

April 28, 2018
Completed left upper wing compression struts, drag anti-drag cables. Tiffany heat shrinking cable ends. Upper, center, and lower wing spars complete.

Total Time 2.5 hours




Thursday, April 26, 2018


April 25, 2018
Set right lower wing spar into right side of fuselage just to check fit.






April 25, 2018 

Left and right lower wing spars complete. Left and right lower wing spars set into fuselage wing carry through tubes.  

Total Time 4 hours











Monday, April 16, 2018

April 16, 2018
Completed center top wing section. Squared leading and trailing edge wing spars. Cut compression struts to length and installed. Tensioned and swaged  drag/anti drag cables to tangs.


Total time 3.5 hours






April 2, 2018
Drilled all wing spars and related sleeves. Bolted all drag, and lift tangs with compression strut plugs to upper, lower, and center wing spars. (Make sure all holes are straight and square.)

Total Time: 8 hours





March 21, 2018
Drilled out all wing drag tangs and lift tangs. Painted lift tangs.

Total Time: 3 hours





March 15, 2018 
Wing materials arrive. Breakdown crate.


Total Time:  1hour