Tuesday, October 24, 2017



















October 22, 2017 Wire spun brushed all L/H Fuselage gusset plates front and back. 
Total time 1 Hour 




October 22, 2017 - Evening Work...  Finished aft end of L/H side of fuselage. Cut and coped L/H and R/H diagonal rib F20.
Total time 1.5 Hours








Monday, October 16, 2017

 



 October 2, 2017 (2.5 Hours) Finished all vertical ribs for left and right hand sides of fuselages F12, 15, 17,



October 1, 2017 (5 Hours) Bent/formed lower left and right fuselage longerons. Fitted and coped vertical members F6, F7, F9 for the fuselage left hand side. Made duplicates for right hand side of fuselage. 










Sunday, July 23, 2017

July 23, 2017 (1 Hour)
Cut 1" and 1 1/8" oversleeves for main landing gear and cabanes. Cut additional jigs and jig-spacers for critical dimension areas (wing spar carry-through's).












July 22 2017 (2 hours)
Assembled and riveted upper and lower longerons for both left and right fuselage sides. Jigged upper longeron on drawing. Laid upper and lower longerons in jigs for placement.




July 21 2017 (1 hour)
Finished fuselage layout (drawing). Set jigs for lower fuselage longeron.