Saturday, November 25, 2017

November 25 2017 Drew plans for aligning R/H and L/H sides.  Inverted and stabilized R/H and L/H fuselage sides with jigs in preparation for building the bottom of the fuselage.  Total time 3 hours









November 23 2017 Bended and riveted plates on RH fuselage side.  Began planning for inverting fuselage sides to bottom of the fuselage. Total time 1 hour









November 22, 2017 Completed R/H fuselage side mirrored exactly to L/H side. R/H and L/H fuselage sides complete. Total Time 6.5 hours




November 21, 2017 Jigs, jigs, and more jigs, making the R/H fuselage side exactly mirrored to the L/H. Jigged, drilled, and riveted forward R/H fuselage side to mirror the Left.  Total Time 3 hours













Friday, November 24, 2017

October 27 2017

Jigs after L/H fuselage is completed and removed from the work bench and hung the newly acquired German flag.