Fokker D VII Build
Saturday, November 25, 2017
November 25 2017 Drew plans for aligning R/H and L/H sides. Inverted and stabilized R/H and L/H fuselage sides with jigs in preparation for building the bottom of the fuselage.
Total time 3 hours